







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat It Really Costs to Reface Kitchen Cabinets in Coral Gables, FL
Refacing kitchen cabinets in Coral Gables typically runs $14,000-$45,000 for a full kitchen, with most pre-1950 Mediterranean Revival homes landing in the $18,000-$28,000 band once substrate repairs are counted. A 10-cabinet job quoted online at $4,000 can reach $7,500 in a 1940s Coral Gables kitchen the moment a crew inspects the Dade County pine boxes and specifies moisture-resistant adhesive for the humidity load off Biscayne Bay. For a written price before any work begins, call (833) 510-5367.
The gap between those two numbers isn’t upsell. It’s substrate. This page explains where your money actually goes, what a correct inspection looks like, and how to compare a Bradford written quote against a verbal estimate from a crew that has never opened a Coral Gables cabinet box in its life.

Why Coral Gables Kitchens Cost More to Reface Than the Online Calculator Says
Coral Gables is built on a specific housing stock: 1920s-1940s Mediterranean Revival and Mission-style homes with original clay barrel-tile roofs, coquina and coral rock detailing, and Dade County pine framing throughout. That pine shows up in the cabinet boxes too. It’s dense, it moves with humidity, and it does not take adhesive the way a modern plywood carcass does.
Three things drive cost here that a national price-per-door calculator never sees:
- Non-standard cabinet depths. Pre-war Coral Gables millwork was built in place, not bought from a catalog. A 13-inch-deep upper or a 22-inch base means every new door front and veneer panel is a custom cut, not a stock order.
- Dade County pine box construction. The pine needs sanding, sealing, and a bonding primer before any veneer touches it. Skipping that step is how a reface fails in 18 months.
- Humidity and salt air off Biscayne Bay. Miami-Dade’s High-Velocity Hurricane Zone climate means constant moisture cycling. Standard contact adhesive delaminates under that load. We spec moisture-resistant bonding on every Coral Gables reface as a baseline, not an add-on.
Add the city’s Board of Architects review process and you get a job where locally experienced crews plan the timeline and out-of-town crews get blindsided. Coral Gables runs one of the few full-service municipal building departments in the country, and most exterior work in the city goes through design review that can add 60-90 days.
What We Inspect Before We Quote a Single Cabinet
Bradford Remodeling Co Coral Gables runs a substrate-condition inspection before any number goes on paper. Refacing over delaminated or water-damaged boxes is a job that fails inside 18 months, and no written guarantee is worth anything if it’s backing a bad assessment.
Here’s what we check, in order:
- Box integrity. We probe the pine at every corner joint, under the sink, and along the toe kick. Soft wood, separation, or swelling from a slow leak means repair before reface.
- Moisture reading. A pin meter on the back and side panels tells us whether the wood is still holding water from a past event. Wet pine holds adhesive poorly.
- Square and plumb. Settlement in older homes throws boxes out of square. Face frames get shimmed and leveled before veneer goes on, or every door will show a gap.
- Depth and width inventory. Every cabinet gets measured. Custom sizing gets priced upfront, not discovered mid-job.
- Hardware and rough-in. Soft-close hinges, drawer slides, and any pull placement are specified in writing before the order goes out.
The 365-Day Done Right Promise backs that assessment in writing: if the work fails inside the full-year guarantee window, we come back and correct it at no charge. That coverage only means something if the substrate call was right to begin with, which is why the inspection comes before the quote, not after.

Line-Item Cabinet Refacing Prices for Coral Gables
Use this table to compare a written Bradford quote against a verbal estimate. Every line should appear on your quote with a real number next to it. If a crew won’t put the breakdown in writing, treat the price as fiction.
| Line item | Typical range in Coral Gables |
|---|---|
| Door and drawer-front material (per opening, KraftMaid or Wellborn veneer) | $180-$420 |
| Labor per cabinet (prep, substrate repair, bonding, install) | $220-$550 |
| Edge-banding and face-frame veneer (per linear foot) | $35-$85 |
| Hardware (hinges, slides, pulls) per cabinet | $40-$120 |
| Substrate repair and moisture-resistant bonding (pine boxes) | $900-$3,200 |
| Custom sizing for non-standard depths | $300-$1,600 |
| Full kitchen reface, all-in | $14,000-$45,000 |
For context on the wider market, a full Kitchen Remodeling in Coral Gables runs $14,000-$45,000, while new cabinet installation sits at $4,000-$13,000. Reface wins when the boxes are sound. Replace when they aren’t. A countertop installation in Coral Gables runs $2,000-$6,500 if you’re pairing the reface with new surfaces, and a backsplash installation adds $800-$2,500.
Why We Spec the Veneer by Brand and Lot Number
Every Bradford reface quote lists the exact cabinet line and finish going on your wall, by brand and material lot number. When a homeowner sees “KraftMaid” or “Wellborn” printed on the quote with a lot number beside it, they know what’s arriving before the truck does.
It matters more than it sounds. Cabinet veneer finishes vary between production runs, and a lot matched to your sample is a lot that won’t arrive a shade off. If your surfaces are getting replaced at the same time, Cambria and Caesarstone slabs get the same treatment. Hardware gets specified in writing too: Kohler and Moen are on our documented roster if the reface touches the sink or faucet.
We work the same way on every job under The Garrison Standard: written price before work starts, no numbers that move at the door, and a signed guarantee in your hand at close. If the reface is part of a larger scope, that extends to the full Kitchen Remodeling work, and the same discipline applies to anything else on the home. See our home page for the full service scope.
Why Locals Factor the Board of Architects Into the Schedule
Coral Gables is one of the few cities in the country where a window replacement can trigger design review. Any kitchen renovation that touches exterior-facing window trim in a Board of Architects review zone may run through the city’s approval process, and that can add 60-90 days to the job. Most refacing-only contractors never mention it because they’ve never worked inside the city limits.
We plan for it. If the scope grazes the exterior, the design-review timeline goes into the written schedule before work starts. Corrosion-resistant fasteners get specified throughout, because the salt air off Biscayne Bay eats cheap hardware. And if a fence or exterior element is part of the overall project, that’s a separate review you’ll want budgeted. If you’re comparing across trades on the home, our pages on Bathroom Remodeling in Coral Gables and Roof Replacement in Coral Gables cover the way review timelines work on those scopes.
Key Takeaways
- Refacing a Coral Gables kitchen runs $14,000-$45,000, driven by substrate condition as much as door count.
- Dade County pine boxes need prep and moisture-resistant bonding that modern plywood doesn’t; that’s labor, not upsell.
- Every Bradford quote lists door and drawer-front brands by lot number so nothing about the finish is a guess.
- The 365-Day Done Right Promise is a full-year written guarantee on every completed reface project.
- Board of Architects review can add 60-90 days if the scope touches the exterior; experienced local crews plan for it, out-of-town crews don’t.
FAQs
Cabinet refacing in Coral Gables typically runs $14,000-$45,000 for a full kitchen, with many pre-1950 Mediterranean Revival homes landing between $18,000 and $28,000 after substrate repair. Door count matters, but so do box condition, cabinet depth, and the moisture-resistant bonding specified for a Biscayne Bay climate. Call (833) 510-5367 for a written price before any work starts.
Yes, refacing typically costs 40-60% less than full cabinet replacement when the boxes are structurally sound. In Coral Gables, the reface-vs-replace decision comes down to the pine substrate: if the boxes are solid, refacing wins on cost and saves a demo day. If the boxes have water damage or separation, replacement is the smarter spend. Call (833) 510-5367 and we’ll give you the honest call, in writing.
Most Coral Gables refacing jobs run 3-6 working days once materials arrive, with a few extra days added if substrate repairs or custom-sized fronts are in the scope. Board of Architects review, if triggered by exterior-facing work, can add 60-90 days to the overall project timeline. Call (833) 510-5367 for a written schedule alongside the written price.
Yes. Every completed Bradford refacing project is covered by the 365-Day Done Right Promise: a full-year written guarantee, and if the work fails inside that window we return and correct it at no charge. That guarantee is the reason we inspect substrate before quoting, because backing a job that was doomed from day one helps nobody. Call (833) 510-5367 for a free estimate.
Get a Written Price Before Any Tools Come Out
Call (833) 510-5367 for a free estimate and a written price on your Coral Gables kitchen reface. Every quote includes line-item pricing, brand and lot number on the veneer, and the 365-Day Done Right Promise in writing. We’ll walk the substrate with you first, tell you what we find, and put the number on paper. A real person answers, any hour.
Written by the team at Bradford Remodeling Co Coral Gables, serving Coral Gables, FL.
What Our Customers Say
"Respectful crew. Covered the floors and swept every day."
- Jackie T."Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Straightforward people who do what they say. The crew did what the contract said and called before changing anything."
- Dianne W.












