







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Jerith Home Additions & ADU: The Coral Gables Owner’s Guide
Home additions and ADU work under a Jerith specification in Coral Gables typically runs $45,000 – $130,000 installed, and we schedule free estimates now rather than same-day dispatch. That range covers planning help, permits, site prep, framing, finishes, and closeout, with a written line-item price before any work starts. Bradford Remodeling Co Coral Gables is an independent service provider, not affiliated with Jerith.
Owners usually come to this page after something in the addition has stopped behaving. A stand-alone unit that smells damp after a July storm. A stick-built addition whose roofline sags where it meets the main house. A converted garage in Coral Gables where the floor sits lower than the adjacent hallway. Those failures almost never trace back to the brand. They trace to the assembly underneath: the waterproofing detail, the tie-in flashing, the slab height, the subfloor deck that wasn’t built for a real Florida wet season.
Which Jerith Models This Applies To

Compatibility starts with paperwork, not part numbers. Find the plan set or the stamped engineering sheets left with the unit or the addition. Jerith product lines differ in footprint, framing method, and panel or module joinery, and an addition built by other hands on a different system won’t match hardware or gaskets no matter how close it looks. If the papers are gone, the manufacturer label or data plate on the unit or module is the next stop. Non-structural pieces like end caps, fasteners, and gaskets are often interchangeable within the same series or module line, but anything structural or glazed is marked to a specific series and won’t swap in cleanly.
We take three measurements before quoting: footprint at grade, wall height at the eave, and the tie-in depth where the addition meets the main house. That tie-in depth is the detail most often wrong, and it’s what causes the roofline and water problems owners call about.
OEM vs. aftermarket is a real call, not a sales line. For trim and cosmetic pieces, a quality aftermarket equivalent can work fine when it matches the profile and finish. For structural components, tie-ins, and glazing units, we quote the OEM-grade part and say so in writing, with manufacturer specs and warranties backing our own 365-Day Done Right Promise: if the work fails within the guarantee period, we come back and correct it at no charge.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Jerith Home Additions & ADU Is Failing
- Water stains or damp drywall at the tie-in. The flashing where the addition meets the main house has degraded or was never stepped correctly. That’s the most common failure in Coral Gables because our summer rain is relentless.
- A floor that feels spongy or out of level. The subfloor deck has absorbed moisture or the framing has shifted. With a converted garage, a height mismatch at the doorway is a strong early clue.
- Roofline sag along the addition edge. That signals fascia or framing movement, or support spacing that wasn’t built to the real load. Cosmetic fixes won’t hold until the structure is corrected.
- A persistent musty smell inside the unit. An interior moisture or ventilation issue, not a surface problem. Cleaning won’t fix it; the source has to be found.
- Gaps or a draft at seams between modules or panels. Gaskets and fasteners have worked loose. This is one of the cheaper fixes if caught early.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For an addition or ADU scope in Coral Gables, expect $45,000 – $130,000. What pushes you toward the top of that range: a full ADU build instead of a partial addition, impact glazing on the openings, work on an older home where the tie-in has to be rebuilt, and structural framing repairs found during opening. Most homeowners land in the middle, not at either end.
Here’s what the price includes, line-item, in writing before a tool comes out:
- Site prep, demolition of the failed assembly if needed, and debris removal
- Framing, tie-in, and flashing correction to code
- Structural framing repairs where the opening reveals them
- Waterproofing and weather sealing at every seam
- Permit coordination and final inspection
- Clean site at close, and a signed written guarantee in your hand
The 365-Day Done Right Promise covers workmanship on everything we touch for a full year from closeout. No numbers move at the door. If issues turn up behind the walls, we bring that to you with the reason before anything changes the scope, not as a surprise on the final invoice.
DIY or Call Us?
What you can safely check: the manufacturer label, the plan set, the area around the tie-in for staining, and whether the floor is level. Poking at a wet seam to see if it moves is fine. Anything load-bearing is not. Cutting into a tie-in, pulling framing, or re-routing a structural connection isn’t a homeowner task, and this is where a weekend fix turns a thousand-dollar repair into a rebuild.
If the seam feels soft or the wall around it is waterlogged, stop and call. Those are structural and moisture issues, not cosmetic ones, and they get worse fast in Florida humidity. If the contract you got from another contractor doesn’t spell out tie-in scope and glazing requirements in writing, that’s a red flag worth calling about. Reach us at (833) 510-5367, free estimates, live person every time.
FAQs

What’s the realistic lifespan of a Jerith addition or ADU in Coral Gables? The unit or module shell usually holds up well past twenty years when installed correctly. The parts that age first in South Florida, regardless of brand, are sealants, gaskets, flashing, and any fasteners in the wet zone. Humidity and sun do most of the damage, not the structure itself.
Can a failed addition be repaired instead of replaced? Usually yes, especially when the failure is at the seam or the subfloor. We’ll tell you straight if a repair is honest or if it’s just buying time. Call (833) 510-5367 for a free assessment.
How long does the swap take? A targeted repair is often a few days on site. A full section swap or addition scope runs weeks, not days. The honest timeline comes in the written scope, not over the phone.
How do you source the right Jerith part? We verify the plan set or data plate, confirm series compatibility, and quote OEM-grade where it matters with manufacturer specs in hand. We don’t stock parts, and we don’t guess at compatibility. Call (833) 510-5367 and we’ll sort the right part before anyone swings a hammer.
How much does an addition or ADU cost in Coral Gables? $45,000 – $130,000 installed, depending on scope, glazing, and how much of the tie-in needs rebuilding. We also handle cabinet and finish work in adjacent spaces on the documented premium brands, including KraftMaid, Cambria, and Silestone. Call (833) 510-5367 and we’ll price your project in writing before work begins.
Written by the team at Bradford Remodeling Co Coral Gables, serving Coral Gables and nearby areas.












